earned value analysis

earned value analysis
"A method for determining project performance which involves comparing the value of the work that was planned with the budgeted cost of the work performed to date, with what was actually spent. These comparisons provide invaluable information about actual conditions within the project and trends that may be developing in terms of schedule and cost performance."
تحليل القيمة المكتسبة

English-Arabic terms dictionary. 2015.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • Earned Value Analysis — Die Earned Value Analysis bzw. Leistungswertanalyse (z.T. auch als Fertigstellungswertmethode oder Arbeitswertanalyse bezeichnet) ist ein Werkzeug des Projektcontrollings. Sie dient zur Fortschrittsbewertung von Projekten. Dabei wird die aktuelle …   Deutsch Wikipedia

  • Earned value analysis — Die Earned Value Analysis bzw. Leistungswertanalyse (z.T. auch als Fertigstellungswertmethode oder Arbeitswertanalyse bezeichnet) ist ein Werkzeug des Projektcontrollings. Sie dient zur Fortschrittsbewertung von Projekten. Dabei wird die aktuelle …   Deutsch Wikipedia

  • Earned Value — Die Earned Value Analysis bzw. Leistungswertanalyse (z.T. auch als Fertigstellungswertmethode oder Arbeitswertanalyse bezeichnet) ist ein Werkzeug des Projektcontrollings. Sie dient zur Fortschrittsbewertung von Projekten. Dabei wird die aktuelle …   Deutsch Wikipedia

  • Earned Value Management — Die Earned Value Analysis bzw. Leistungswertanalyse (z.T. auch als Fertigstellungswertmethode oder Arbeitswertanalyse bezeichnet) ist ein Werkzeug des Projektcontrollings. Sie dient zur Fortschrittsbewertung von Projekten. Dabei wird die aktuelle …   Deutsch Wikipedia

  • Earned Value-Management — Redirect Earned Value Analysis …   Deutsch Wikipedia

  • Earned value management — (EVM) is a project management technique for measuring project performance and progress in an objective manner. EVM has the ability to combine measurements of scope, schedule, and cost in a single integrated system. Earned Value Management is… …   Wikipedia

  • Earned Schedule — (ES) is an extension to the theory and practice of Earned Value Management (EVM). As of 2005, Earned Schedule is designated as an emerging practice by the Project Management Institute. It was introduced in 2003 a seminal article Schedule is… …   Wikipedia

  • Value added tax — Taxation An aspect of fiscal policy …   Wikipedia

  • Value over replacement player — In baseball, value over replacement player (or VORP) is a statistic invented by Keith Woolner that demonstrates how much a hitter contributes offensively or how much a pitcher contributes to his team in comparison to a fictitious replacement… …   Wikipedia

  • Value (economics) — Economics …   Wikipedia

  • Data & Analysis Center for Software — The Data Analysis Center for Software (DACS) is one of several United States Department of Defense (DoD) sponsored Information Analysis Centers (IACs), administered by the Defense Technical Information Center (DTIC). It is technically managed by… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”